Sign In | Join Free | My entremaqueros.com
China Gu an Jianneng Trading Co., Ltd logo
Gu an Jianneng Trading Co., Ltd
Gu an Jianneng Trading Co., LTD High-quality & competitive price to survival , Integrity service for development.
Active Member

7 Years

Home > Steel Ladder Cage >

Galvanized Construction Building Steel Ladder Cage / Metal Scaffolding Ladder Cage

Gu an Jianneng Trading Co., Ltd
Contact Now

Galvanized Construction Building Steel Ladder Cage / Metal Scaffolding Ladder Cage

Brand Name : JN

Model Number : 4m*2m*2m or 3m*2m*2m

Certification : CE ISO

Place of Origin : Hebei, China

MOQ : Negotiable

Price : Negotiable

Payment Terms : T/T, Western Union, L/C

Supply Ability : 2000 PCS per month

Delivery Time : withhin 15 days

Packaging Details : Seaworthy Package

Material : Q235

Cage dimension : 3m*2m*2m or 4m*2m*2m

Max. working height : 100m

Surface treatment : Spray painted, Galvanized

Promise : Strong quality, Competitive Price

Application : Highway And Bridge Engineering Foundation Pit Construction

Contact Now

Galvanized Construction Building Metal Scaffolding Ladder Cage , Scaffold Stair Tower Cage

Construction scaffolding safety step ladder cage is mainly composed of steel frame, ladder, handrail and wire guard, which has high loading capacity and stability. Widely used in the construction of bridge, subway construction and highway, providing safe and easy access to higher level of scaffolding platform.

Customized shape and specification are acceptable.

Technical Parameter

1. Cage size: 4m*2m*2m; 3m*2m*2m

2. Material: Q235

3. Color: As your requirement.

4. Max. working height: 100m

5. Loading capacity: 2000kgs

6. Box / Completely closed / Seal type construction scaffold safety ladder cage

Finish dealing painting or galvanizing
Size as client drawing to design
Design we also can design for client
Transportation easy to be packed into container
Name painting or galvanizing steel structure for steel frame
Product Keywords Construction Building Metal Scaffolding Ladder Cage , Scaffold Stair Tower Cage

Product Feture and advantage:

Steel Deep Excavation Pier Construction Scaffolding Safety Step Ladder Cage

1. Strong bearing capacity: the overall structure adopts a frame-type composite structure. The high-strength bolts are connected up and down with reliable anti-damping force.

2. Safety and reliability: the new type of compound ladder cage is completely enclosed, which can prevent falling and climbing accidents.

3. Simple and quick installation: all the components of this product are standard common standard parts, which shall be installed according to the installation instructions of our company.

4. Good comprehensive benefits: standardized component series, easy to transport and manage, free of scattered and easily lost components, low loss, low late investment, high reuse rate and long service life.

Installation method of construction scaffold stair tower with socket and spigot joints:

Operator: 3 persons

Step 1: place 4 adjustable bases on the ground where the safety ladder is scheduled to be installed according to the rectangular position of 2.44x1.27 meters. Adjust the nut to the uniform height of about 120mm.

Step 2: install 1 bottom door bracket at the entrance of the ladder, and insert the door bracket vertical bar into the adjustable base. Install 2 middle layer racks on the opposite side by the same method, and install the cross bar and inclined pull bar to connect and fix the bottom door bracket and middle layer bracket.

Step 3: install the "Z" ladder. The ladder starting platform is opposite to the door frame entrance of the ground floor.

Step 4: after installing the two-layer ladder, continue to install the middle layer frame, cross bar and inclined bar. Install one layer of ladder for each middle layer frame, and so on.

Step 5: when installing the last layer of ladder, install the top frame and guard rail (cross bar), and lay 2 pedals on the top platform. Note that the top door frame should face the construction subject.

Step 6: install the bridge pedal outside the outlet of the top floor bracket. One end of the bridge pedal is connected with the top floor bracket, the other side is connected with the construction body, and the handrails are installed on both sides of the bridge pedal.

Step 7: finally install the inner rails for all ladders. At this point, safety ladder installation is completed.

Galvanized Construction Building Steel Ladder Cage / Metal Scaffolding Ladder Cage

Galvanized Construction Building Steel Ladder Cage / Metal Scaffolding Ladder Cage


Product Tags:

safety step ladder cage

      

safety construction cage

      
 Galvanized Construction Building Steel Ladder Cage / Metal Scaffolding Ladder Cage Manufactures

Galvanized Construction Building Steel Ladder Cage / Metal Scaffolding Ladder Cage Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Gu an Jianneng Trading Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)